Achievements

HOSPITAL ACHIEVEMENT ON MAJOR CAPITAL PROJECTS   YEAR 2015 to DATE

Below is a table and list showing the achievements achieved from 2015 to to date;

  1. We Constructed a waste zone (incinerator, ash pit and placenta pit)
  2. Acquired a new ambulance from MoHCC
  3. Renovated the theatre i.e petitioning the rooms, tiling, equipping and installing air conditioner).
  4. Installed a solar power backup system amounting to USD 22.000.00 through Call to Women funding
  5. Acquired a Toyota vehicle we used to share with Mutambara (Ruvheneko) we paid USD $5000.00 through HSF.
  6. Received a dental chair from Dr Abrahmson
  7. We received three nurses on secondment and one laboratory technician from MoHCC.
  8. Garden – we are feeding our inpatients with fresh vegetables from the garden.
  9. Field – we are feeding our inpatients with mealie meal from maize from our field.
  10. We have started raring poultry.

PROJECT NAME

FUNDER

LOCATION

STATUS

CONSTRUCTION OF WASTE ZONE

HTF & HSF

OMH

COMPLETED

RENOVATION OF THEATRE

MoHCC & HSF

OMH

COMPLETED

CONSTRUCTION OF 2 HOUSES

BEIT TRUST

OMH

COMPLETED

RENOVATING HOSPITAL KITCHEN

MoHCC

OMH

COMPLETED

REDOING PLUMBING SYSTEM AND TILING OF HOSPITAL TOILETS & BATHROOMS

CLYTA CODER (USA)

OMH

COMPLETED

WASHING MACHINE, ROLLER IRON AND DRYER INSTALLATION

GBGM

OMH

COMPLETED

CHEMISTRY ANALYSER

GBGM

OMH

COMPLETED

SOLAR POWER BACKUP SYSTEM

UMW

OMH

COMPLETED

AIR CONDITIONING SYSTEM

MoHCC

OMH theatre

COMPLETED

AIR CONDITIONING SYSTEM

MoHCC

OMH lab

COMPLETED

NEW AMBULANCE

GVT

OMH

FUNCTIONING – NEW

NEW DENTAL CHAIR

DR ABRAHMSON

OMH

COMPLETED

PAINTING OF VCT

ZACH

OMH

COMPLETED